|
PSE&G Sewaren Plant – Sewaren,
NJ
A generating station including turbine generator, boilers,
precipitators and stack is removed from an active electrical
generation facility, preserving the adjacent power house,
clarifiers and fuel storage tanks.
Initial
Boiler Removal
The front section of the boiler house is severed and rolled into the turbine generator area. |
| Click Here for Slideshow |
 |
 |
 |
 |
 |
 |
 |
 |
Click photos
for larger view |
|